A still rendering directly from Blender:
A flythrough-style video with the tree models imported into UE4 with falling leaf particles and animated leaf materials:
![]() |
| Physical training classroom and stairs to the balcony |
![]() |
| Recolored the brown wainscot texture for tan bricks, and added a "bonded" version for trim |
![]() |
| Stairs from the gym to the locker room |
![]() |
| Stairs from the gym to the locker room (alternate angle) |
![]() |
| Stairs to the gym from the locker room; also windowsill using new bond texture |
![]() |
| Gym lantern |
![]() |
| Vestibule doors |
![]() |
| Vestibule doors (alternate angle) |
![]() |
| Gym "gallery" from the 1918 version (balcony expanded circa 1925) |
![]() |
| Furnished locker room; lockers and benches re-purposed from 1914 level |
![]() |
| Fire escapes; the lower escape is from 1918 while the upper was added circa 1925 |
![]() |
| Fire escapes (alternate angle) |

![]() |
| The page from the blueprints |
| Photo reference from the Rosemary |
![]() |
| The stairs in Blender |
![]() |
| The stairs imported into Unreal Engine |
![]() |
| Ticket booth |
| "The New Urbana High School" from the 1915 Rosemary. The big empty space on the right of the photo is where the gym was to be built. |
![]() |
| An additional photo, taken from a postcard. The slim line of white on the far right shows that the gym addition has not yet been built, and places this photo as sometime early 1915. |
| This dated photo shows that in late November of 1915, construction still had not started. |
![]() |
| Brick ornament on rear of 1914 building, hidden by 1986 addition |
![]() |
| Brick ornament, hidden no more! |